Conair FC-33 Uživatelská příručka Strana 13

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 58
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 12
UGG003/0398 CF Series Granulators
INSTALLATION 9
5.4 Closing the screen box, granule bin and hopper
NOTE! Before closing, make sure that the mating
surfaces are clean!
There is a pinch risk during closing, be careful.
Close the screen box and install the granule bin
1. Make sure that the screen is correctly
positioned in the screen box.
2. Lift the screen box up and tighten the
star knobs properly to stop.
3. Install the granule bin.
4. Install the extraction pipe.
Alt. CF series-U, do up the quick
coupling (D) on the outlet
pipe stub.
5. Close the door.
Close the hopper
1. Check and make sure that
no granulate lies on the
mating surfaces or flanges.
2. Shut/fold back the hopper.
3. Open and make sure that the
tipping catch falls into the cutout.
4. Lock the hopper with the star knobs, tighten
the star knobs properly to stop.
5. Switch the main switch ÒOnÓ.
6. Start the granulator.
Zobrazit stránku 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 57 58

Komentáře k této Příručce

Žádné komentáře