CONAIR05-15-96 79 1MANUALCL-79MNL-00102WARNING - Reliance on this Manual Could Result in Severe Bodily Injury or Death!This manual is out-of-date and
CONAIR05-15-96 79 106. Operation and daily maintenance6.1 Starting and stoppingThe start and stop functions are controlled by a change-over button on
CONAIR05-15-96 79 116.4 Trouble-shooting6.4.1 If the granulator does not start• Check that the saftey switches’ break screws are turned fully clockwis
CONAIR05-15-96 79 127. ServicingAll servicing work should be carried out by a qualified service engineer and inthe order described, to prevent persona
CONAIR05-15-96 79 13Assembling the rotating knives1. Clean the cutter's knife location and place a rotating knife in the knifelocation.2. Fasten
CONAIR05-15-96 79 147.2 Sharpening the knivesAlways take great care when sharpening the knives since theyare very sharp and can cause personal injury.
CONAIR05-15-96 79 15Rotating knives:NOTE: All rotating knives should be sharpened equally so that the cutter doesnot become unbalanced.• The rotating
CONAIR05-15-96 79 167.3 Inspecting and adjusting the beltsThe V-belts must be inspected after 30 hours’ operation.• Loosen and remove the outer plateo
CONAIR05-15-96 79 177.5 Rotor pulley, assembling/disassembling7.5.1 Rotor pulleyDisassembling1. Loosen all screws a few turns.2. Unscrew two of the sc
CONAIR05-15-96 79 188. Spare parts list8.1 OverviewPage8.1.1 79, Cutter housing ... 19-218.1.2
CONAIR05-15-96 79 198.1.1 79, Cutter housing, all modelsPos Qty. Part no. Pos Qty. Part no. Pos Qty. Part no.1 1 9-30172 10 1 9-50082 19 2 4-024112 3
CONAIR05-15-96 79 2Contents1. Introduction...32. Tec
CONAIR05-15-96 79 208.1.1 79, Cutter housing, all models
CONAIR05-15-96 79 21Pos Qty. Part no.A 6 9-40165B 6 9-40150C 6 9-40203D 4 9-40161E 6 9-40140E 8 9-40054F 4 9-40160G 1 4-02531H 6 4-118358.1.1 Cutter h
CONAIR05-15-96 79 228.1.2 79Pos. Qty. Part no. Pos. Qty. Part no.1 1 2-12112 13 2 9-912552 1 9-50353 14 2 4-130223 1 2-11756 15 1 3-135614 4 9-50071 1
CONAIR05-15-96 79 238.1.3 79Pos. Qty. Part no. Pos. Qty. Part no.3 1 2-11756 13 2 9-912554 4 9-50071 14 2 4-130225 1 4-12109 15 1 3-135616 1 4-12890 1
CONAIR05-15-96 79 2479Pos. Qty. Part no.29 1 9-11036-1130 1 2-1579931 1 9-107898.1.4 79, Hopper79Pos. Qty. Part no.29 1 9-1103430 1 2-1373731 1 3-1374
CONAIR05-15-96 79 258.1.5 79, Blower F3 with cyclone AX-5Pos. Qty. Part no.1 1 2-105932 1 9-204803 1 3-177724 1 2-158385 1 2-158316 1 9-204857 1 4-159
CONAIR05-15-96 79 268.1.6 Pause/pulse relay when emptying with air veyorIn those cases when emptying of the granule bin with an air veyor has beenchos
CONAIR05-15-96 79 279. Electrical scheme
CONAIR05-15-96 79 2810. Layout10.1 DimensionsPage10.1.1 79 ...2810.1.2 79 ...
CONAIR05-15-96 79 2910.1.2 79
CONAIR05-15-96 79 31. IntroductionThis manual is for CONAIR MARTIN's 79 series granulators. Theabbreviations mean:-B = Band conveyor -U = Suction
CONAIR05-15-96 79 3010.1.3 79
CONAIR05-15-96 79 3110.1.4 79
CONAIR05-15-96 79 3211. Options11.1 OverviewPage11.1 Overview ...
CONAIR05-15-96 79 3311.1.1 79, all models: Third fixed knife, disassembling/assemblingPos. Qty. Part no.1 1 1-190222 1 2-177323 1 2-177334 2 9-401065
CONAIR05-15-96 79 3411.1.2 79, all models: Third fixed knife, sharpening200Then the knife is fastened in the 79 fixture andis sharpened to its correct
CONAIR05-15-96 79 3511.1.3 79, Hopper with band conveyorDisassembling/Assembling the band conveyorDisassembling1. Release the fastening screw (A). Thi
CONAIR05-15-96 79 3612. Transporting and storing12.1 OverviewHandling and transporting of the machinery should be carried out by speciallytrained pers
CONAIR05-15-96 79 42. Technical specifications2.1 DimensionsSee chapter 10, Layout.2.2 DataSerial NumberMotor power...
CONAIR05-15-96 79 53. Functional description3.1 Overview79 granulators are designed for grinding different types of plastic waste.The granulator is co
CONAIR05-15-96 79 63.2 Safety systemSince there are rotating knives inside the granulator, there is a built-in safetysystem to prevent personal injury
CONAIR05-15-96 79 74. Safety regulations4.1 OverviewThe granulator is equipped with safety switches to prevent the front door andthe hopper from being
CONAIR05-15-96 79 85. InstallationAll instructions must be carried out in the order described, to prevent personalinjury or damage to machinery.Always
CONAIR05-15-96 79 95.3 Electrical connectionThe granulator should be connected up by an authorised electrician.• Connect the granulator to the mains s
Komentáře k této Příručce